Fifty-second Legislature                Energy, Environment and Natural Resources

Second Regular Session                                                  S.B. 1417

 

PROPOSED

HOUSE OF REPRESENTATIVES AMENDMENTS TO S.B. 1417

(Reference to Senate engrossed bill)

 

 


Page 9, lines 36 and 37, strike "after the installation of a distributed energy generation system" insert "after the installation of a distributed energy generation system"

Line 38 strike "estimated future" insert "estimated"; strike "during the same"

Line 39 strike "period" insert "during the same period"

Line 41 strike "applied to the duration of the agreement"; strike "The any" insert "The"

Line 42 strike "based on the same utility rates by"

Strike Line 43, insert "based on the same utility rates."

Page 10, line 29, after "If" strike remainder of line

Strike line 30

Line 31, strike "contains" insert "the seller's or marketer's marketing materials contain"

Line 32, after "rates" strike remainder of line

Line 33, strike "generation system" insert "after the installation of a distributed energy generation system"; strike "marketing materials document or sales presentation" insert "marketing materials"

Line 34, strike "estimated future" insert "estimated"

Line 35, strike "during the same period" insert "during the same period"

Line 37, strike "applied to the duration of"

Strike lines 38 through 40, insert a period

Amend title to conform


KEN CLARK

1417CLARK3

02/25/2016

05:44 PM

H: JT/rca