PROPOSED
HOUSE OF REPRESENTATIVES AMENDMENTS TO H.B. 2195
(Reference to printed bill)
Page 1, after line 40, insert:
“f. For an on-site wastewater treatment facility with a design flow of fifty thousand gallons per day or more or for a site with multiple on-site wastewater treatment facilities with a collective design flow of fifty thousand gallons per day or more, the director may require the facility by an addendum to the general permit authorization to provide adequate financial assurance.”
Amend title to conform