The Arizona Revised Statutes have been updated to include the revised sections from the 56th Legislature, 1st Regular Session. Please note that the next update of this compilation will not take place until after the conclusion of the 56th Legislature, 2nd Regular Session, which convenes in January 2024.
DISCLAIMER
This online version of the Arizona Revised Statutes is primarily maintained for legislative drafting purposes and reflects the version of law that is effective on January 1st of the year following the most recent legislative session. The official version of the Arizona Revised Statutes is published by Thomson Reuters.
27-922 - Surface disturbances created by existing exploration operation or mining unit; extension; continuing operations
27-922. Surface disturbances created by existing exploration operation or mining unit; extension; continuing operations
A. An owner or operator of an existing exploration operation or existing mining unit with surface disturbances of more than five contiguous acres shall submit a reclamation plan to the state mine inspector by April 1, 1997.
B. An owner or operator may petition the inspector for an extension of time to submit a reclamation plan. The inspector shall grant the extension on a showing of good cause, including the need to coordinate the preparation and submission of a reclamation plan with an aquifer protection permit application under title 49, chapter 3, article 2 or with other permits and approvals required for the exploration operation or mining unit.
C. The owner or operator of an existing exploration operation or existing mining unit may continue operations, including creating surface disturbances, until the inspector takes final action on the reclamation plan and financial assurance mechanism.
D. The reclamation of surface disturbances created in whole or in part before July 17, 1994, the effective date of this chapter, and the initial rules adopted pursuant to this chapter may present special technical and economic constraints that are not encountered for new surface disturbances. The inspector shall consider the nature and extent of the existing surface disturbances, relevant site-specific circumstances and the technical and economic practicability of reclaiming such surface disturbances. The inspector shall not require the removal or relocation of existing mining units to satisfy the reclamation requirements of this chapter.